Woman in straw hat smiles, holding wine glass near a lake.

5+

Years Of Experience


Ground Ready for What Comes Next

Professional excavation services for residential and commercial properties in Pana, Illinois.

You need the ground dug to specific depths and dimensions before any construction can begin in Pana. Whether you are preparing for a foundation, running new utility lines, or creating drainage paths, the work starts below the surface where precision matters most.

BTG Landscaping & Excavation handles foundation digging, trenching for utilities, and earthmoving for both residential and commercial projects in Pana. The service includes removing soil to the depth and slope your project requires, ensuring the site remains stable and ready for the next phase. Each job uses modern excavation equipment operated with owner oversight to maintain control throughout the process.

If you are planning construction or site work in Pana, you can request a free estimate to review what your project needs and how the excavation will be handled.

How the Ground Gets Prepared for Construction

When you schedule excavation work in Pana, the crew begins by marking utility lines and confirming the depth, width, and slope your project requires. Heavy equipment removes soil in layers, and the area is shaped to match the specifications provided by your contractor or builder.

After excavation is complete, you will see clean edges, proper depth, and a stable base ready for footings, pipe installation, or drainage systems. Precision work ensures proper depth, slope, and site stability. The ground no longer shifts under weight, and water drains where it should instead of pooling near structures.

This service supports construction projects, drainage improvements, and landscape installation across residential and commercial sites. It does not include paving, concrete work, or backfill beyond what is necessary to stabilize the excavated area. The work prepares your site so the next crew can begin without delay or complications caused by uneven or unstable ground.

You probably have a few questions before digging starts

Most people want to know what happens before the equipment arrives, how long the work takes, and what gets left behind once excavation is finished.

What does excavation include for a typical residential project?
It includes digging trenches for utilities, removing soil for foundation footings, and shaping the ground to support construction. You receive a site that meets the depth and grade specifications your builder or contractor provides.
How long does excavation take on a standard lot?
Most residential excavation projects in Pana take one to three days depending on soil conditions, access, and the size of the area being dug. You will know the estimated timeline after the site is evaluated.
What happens to the soil that gets removed?
Soil is either redistributed on your property where grading is needed or hauled away if there is no use for it on site. The crew confirms this with you before excavation begins so you know what to expect.
When should excavation be scheduled during a construction project?
Excavation happens after permits are secured and utility lines are marked, but before footings or foundations are poured. Your contractor or builder will coordinate timing so the site is ready when the next phase begins.
Why does slope matter during excavation?
Slope controls how water moves across your property and away from structures. If the ground is not graded correctly during excavation, water can pool near foundations or erode soil over time.

BTG Landscaping & Excavation is fully licensed and insured, and each project in Pana is managed with owner-operated oversight to make sure the work matches what your site requires. You can contact the team to schedule a free estimate and review the details of your excavation project.