Get the Ground Ready to Build On

Complete site preparation for residential and commercial construction in Pana, Illinois.

You cannot pour a foundation, install a driveway, or build a structure in Pana until the ground is cleared, graded, and leveled to support the weight and use it will receive. Site prep brings together the work needed to create stable ground that meets the specifications your project requires.

BTG Landscaping & Excavation provides complete site preparation for residential and commercial construction in Pana. The service includes clearing, grading, soil leveling, and base preparation. It creates stable ground for foundations, patios, driveways, and structures while helping reduce long-term drainage and erosion problems.

If you have a construction project starting in Pana, you can request a free estimate to review what your site needs before building begins.

What Site Prep Includes Before Building Starts

When you schedule site prep in Pana, the crew begins by clearing vegetation and debris, then grading the land to control water flow and leveling the soil to match the project specifications. Base preparation includes compacting the ground so it can support the structure or surface that will be built on top of it.

After site prep is complete, you will see a clean, level surface with proper slope and a compacted base ready for concrete, footings, or pavement. The ground no longer shifts under weight, and water drains away from the construction area instead of pooling or eroding soil around the site.

This service is handled by an owner-operated company with hands-on project management to ensure each phase is completed correctly. It does not include pouring concrete, installing utilities, or building structures unless those services are requested separately. The work prepares your site so construction can begin on schedule without delays caused by unstable or unprepared ground.

People usually want to know what prep involves

Before work begins, most people ask what happens during site prep, how long it takes, and what the property looks like when the crew is finished.

What does site prep include for a typical construction project?
Site prep includes clearing vegetation and debris, grading the land to control water flow, leveling soil to meet specifications, and compacting the base for stability. You receive a site ready for footings, foundations, or paving.
How long does site prep take on a residential lot?
Most residential site prep projects in Pana take two to five days depending on the size of the lot, soil conditions, and the amount of clearing and grading required. You will receive an estimated timeline during the estimate.
Why is base compaction important during site prep?
Compaction prevents the ground from shifting or settling after construction is complete. Without it, foundations can crack, driveways can sink, and structures can become unstable over time.
When should site prep be scheduled during a construction project?
Site prep happens after permits are secured and utility lines are marked, but before any construction or paving begins. You should schedule it as the first phase of ground work so the site is ready when contractors arrive.
What happens if site prep is not done before building?
Unstable or ungraded ground can cause foundations to settle unevenly, water to pool near structures, and soil to erode around driveways or patios. Site prep prevents these problems by creating a stable base before construction starts.

BTG Landscaping & Excavation is fully licensed and insured, and each site prep project in Pana is managed with owner-operated oversight to make sure the ground is ready before construction begins. You can get in touch to schedule a free local estimate and review what your site requires.